His Grace

Bangalore

Client: The Bearys Group
Architect: Architecture Paradigm
Project: Corporate Office – 50,000 sft (approx.)
Scope: MEP Design

 

Project highlights


  • Cooling load efficiency >1000 sft / TR.
  • Hybrid air conditioning system designed to provide comfort without air conditioning for 75% time of the year.
  • Low pressure drop ductless ventilation system in floor.
  • Ultra low pressure drop piping.
  • Natural ventilation of common areas.

Leave a Reply